Illustrative sample figures · not live plant results
Lines running
9 / 12
OEE (shift B)
86.4%
Black mass today
6.8 t
Energy per tonne
412 kWh
Recovery yield trend
Overall metal recovery efficiency (%)
Work orders
Batch traceability from lot to output stream
| WO | Line | Input batch | Output | Target | Progress | Status |
|---|---|---|---|---|---|---|
| WO-3391 | Shredding Line 1 | LOT-24117 | Black Mass | 24.0 t | 82% | Running |
| WO-3390 | Hydromet Line A | BM-STD-0812 | NiSO4 / CoSO4 | 9.6 t | 61% | Running |
| WO-3389 | Discharge Bay | LOT-24118 | Discharged Cells | 18.4 t | 35% | Running |
| WO-3387 | Hydromet Line B | BM-STD-0809 | Li2CO3 | 4.2 t | 100% | Completed |
| WO-3386 | Shredding Line 2 | LOT-24112 | Black Mass | 16.5 t | 12% | On hold |
Process stages
Standard route for an NMC feedstock lot
1. Deep discharge
Residual energy drained to <2 V, brine or resistive bank
2. Dismantling
Pack → module → cell, casing and BMS separated
3. Shredding
Inert-atmosphere two-stage shredder, dust extraction
4. Separation
Magnetic, eddy current and air classification
5. Black mass sizing
Sieving to <500 µm, homogenisation and assay
6. Hydrometallurgy
Leaching, solvent extraction, crystallisation of Li/Ni/Co