Ohreems ERP — Li-ion Battery Recycling Dashboard

Hosur Unit-1 · Real-time operations overview

Sign in

Illustrative sample figures · not live plant results

Feedstock Intake (MTD)

412.6 t

+8.4% vs last month

Black Mass Produced

168.2 t

+5.1% vs last month

Avg. Recovery Yield

94.3%

+0.7 pts vs last month

Dispatched (MTD)

152.4 t

+6.2% vs last month

Revenue (MTD)

₹6.42 Cr

-2.1% vs last month

Throughput & recovery yield

Intake, black mass and dispatched material across 12 months (tonnes)

Feedstock chemistry mix

Share of intake by cell chemistry

NMC42%
LFP31%
LCO15%
NCA12%

Recovered materials (MTD)

Tonnes recovered by output stream

Alerts

Requires attention today

  • H2O2 stock below critical level

    Chem Store · 3.1 kL of 6 kL reorder point

    Critical
  • LOT-24115 quarantined

    Thermal event risk flagged during SoH scan

    Watch
  • Effluent consent renewal overdue

    SPCB filing was due 15 Aug 2026

    Critical
  • Hydromet Line A yield above target

    Ni recovery at 96.1% for the last 3 batches

    Info

Active work orders

Live status across shredding and hydrometallurgy lines

Work orderLineInput batchOutputTargetProgressStatus
WO-3391Shredding Line 1LOT-24117Black Mass24.0 t82%Running
WO-3390Hydromet Line ABM-STD-0812NiSO4 / CoSO49.6 t61%Running
WO-3389Discharge BayLOT-24118Discharged Cells18.4 t35%Running
WO-3387Hydromet Line BBM-STD-0809Li2CO34.2 t100%Completed
WO-3386Shredding Line 2LOT-24112Black Mass16.5 t12%On hold

Recent dispatches

Latest customer shipments for the selected plant

ShipmentOrderCustomerMaterialQuantityDispatch dateVehicleInvoice
No dispatches recorded